SAVING RESOURCES: RESOURCE LEVELING WITH PRIMAVERA P6
When a project is dependent on a limited amount of resources, Primavera P6 Professional’s Leveling function can be a useful tool in addressing overload situations.
The Leveler tool allows activities to be scheduled in a way that ultimately reduces or eliminates an over-commitment of available resources. This also applies to more than one activity within a project across many projects.
The Leveler can be a profitable tool to utilize in regards to capacity planning and running certain mock scenarios.
Determining priorities is the best place to start.
With Primavera, it is possible to determine priorities at the project level, activity level or both. Look for “Project Level Priority” under the general category of columns. Set a number and see how the project adjusts. The lower the number, the higher priority (think: one equals a top priority, two equals a high priority, etc.). The Leveler will calculate and move activities as the projects are being leveled.
Constraints can also be time sensitive, such as with a specific date.
If you do adjust the dates of the project you are trying to level without telling Primavera P6 Professional, the dates will return to their original position. To combat this, simply make the certain edits in “Level Resources,” “Schedule Options,” and the “Status” tab of the “Activity Details.” This will fix the start date for the activity to be in its new, proper location.
Recent Posts
How to Use Activity Steps in Primavera P6: A “Step-by-Step” Guide
What are Activity Steps in P6? Activity steps allow you to break down activities into…
Read MoreExporting Data from Primavera P6 and Creating Histograms & S-Curves in Microsoft Excel
Managing complex projects often involves analyzing data visually to make informed decisions. One effective way…
Read MoreMastering Primavera P6: 3 Tips to Make Learning a Breeze a Little Easier
Primavera P6 is a powerful project management tool used by professionals worldwide to plan, manage,…
Read MoreMastering Project Success: A Step-by-Step Guide to Using Baselines in Primavera P6
What is a Baseline? In project management, a project baseline serves as a snapshot of…
Read MorePMP vs PMI-SP Certifications: Choosing the Right Path for Your Career
Choosing Between PMP and PMI-SP Certifications: What You Need to Know In the world of…
Read More